Year Project Description / Work Scope Client Address Status
13-Jan Welding Warehouse, Build Wastewater System Wisynco White Marl Industrial Complex, Spanish Town Main Contractor
13-Jul Setting out and construction of Building, Structural Steel Work, Carpentry Work and Roof work Heritage Mall Burk Road, Spanish Town Main Contractor
13-Dec Structural Steel Work, Roof Work, Plumbing and setting out of sewage system, Road Way construction. Metal work including all staircase and balcony and rails. Structural work for main gate. The Merion Apartment Complex 15 Charlton Road, Kingston 10 Main Sub-Contractor
2014 Setting out of Boundary Walls, Guard House and Retaining wall. Setting out of 7 blocks of Building. Structural Steel work, Masonry work and Carpentry work. Responsible for setting out of Road way, curve Walls. Metal work including all staircase and balcony and rails. Structural work for main gate. Valhalla 5 Graham Heights Main Sub-Contractor
2014 Renovation and upgrade of building. Which includes; putting up of Towers, metal work Steal Work Vehicles and Supplies 19-21 Charlton Crescent, Kingston 10 Main Contractor
2015 All construction of Main Building and Rear Commercial Building. Setting of Road Way, Sewage System and Plumbing works and Electrical Works. Including the installation of concrete box Culvert. Responsible for the final design and modification of building. Supervise all Structural Engineers Sugar and Spice Ltd Barbican Main Contractor
2016 Construct Reinforce Concrete Boundary wall 1 mile in perimeter Cari-Med Ltd Spanish Town Main Sub-Contractor
2016-2017 Renovation and remodelling of office spaces (Accounts, Server Room), reconfigure bathroom facilities; renovate new born intensive care on behalf of Berts Auto. Current Maintenance personal for all location Bert Auto Camp Road Main Contractor
2015-2017 Construction of Steel Frame Warehouse. All Concrete and Civil Works and Demolition and Roofing works Tarrant Half Way Tree Main Sub-Contractor
2016-2017 Construction and Installing of all metal staircases in the Town house Units. Responsible for Masonry band Installation. Fabrication of all picket fence and gate, including the construction of gym and pavilion Valley Vista Townhouse and Villas Complex Stony Hill Main Sub-Contractor
2017-2020 Development of Steel frame warehouse, garage, canteen and main Administration Building. Including: infrastructure work, storm and surface water drainage and sewer system BM Equipment/Zoukie Trucking Chesterfield Road (Seaview) Main Contractor
2018-2019 Sub/Super Structure, Roof, tiling, painting, installation of windows and door, drainage, sewer system and swimming pool IQ Optical Residential Development 14 Easton Ave Main Contractor
2019-2020 Sub/Super Structure, Roof, tiling, painting, installation of windows and door, drainage, sewer system Island Concrete Head Office (Caymanas) Main Contractor
Feb 2020-Mar2020 Installation of steel frame structure Commercial Development 8 Phoenix Ave Sub-Contractor
2021 External works to include all civil works. Erection of Earth retaining Walls, Boundary Wall. Design and construction of roadways, including driveway, parking lot. Construction of carports, roof, entry foyers. All external Structural steel works. Erection of Entrance gate, Guardhouse and Trellis. Medinah 21 Townhouse/Apartment Development 21 Salisbury Ave Sub-Contractor
2021 Expansion of Warehouse (21,000 Sq. ft). Structural steel Frame with zinc roof panels. Sewage disposal and Stormwater disposal System AMG Packaging 5 Retirement Crescent Kingston 5 Main Contractor
2021 Design and Construction of Negative edge Infinity pool Private Dwelling Beverly Hills Main Contractor
2021-2022 Erection of Frame Structure for building to include Basement, Ground and First Floor. Design and construction of Sewage disposal system, Septic Tanks, Evaporation bed and Manholes. Waterproofing of Basement Walls. Retaining Wall Construction Tile City Dwelling 3 Middleton, St Andrew Main Contractor
2022 Design base and assemble for the installation of Concrete Silo. Island Concrete Caymanas Main Contractor
2022 Design and Install Base for Scale used to weigh Aggregate and Concrete Island Concrete Clarendon Park Main Contractor
2022 Structural repair of collapsed floor Juci Patty Montego Bay, St. James Main Contractor
2023 Warehouse Renovation Bert Auto Hagley Park Road Main Contractor
2024-2025 Submit Engineering Drawings to KSAC,Construction of building from foundation. Complete Project except for the electrical installation Bert’s Camp Road Warehouse Camp Road Main Contractor
2024-2025 Installation of a cement Silo Island Concrete Montego Bay Main Contractor
2024-2025 Construction of building from foundation,create design and plan layout,Build the roadway structure (parking lot).Complete Project except for the electrical installation CureVac Limited Kingston Main Contractor